Eight services

What each stage actually delivers.

Expand any stage to see the deliverables you receive and when they land in the programme.

We establish what the business actually needs before anyone draws a rack. That means interviewing the people who will use the spaces, auditing what already exists, and testing the brief against budget reality. Where a client is tendering, we write the specification and evaluate the responses.

  • Needs analysis & stakeholder workshops
  • Existing estate audit
  • Technology strategy & room standards
  • Budget modelling
  • Tender documentation & bid evaluation

A full design package that other disciplines can build against. Architects get fixing details and joinery cut-outs, the electrical contractor gets power and containment, and IT gets the network and security requirements — all before the first delivery arrives on site.

  • Signal flow & single-line schematics
  • Rack elevations
  • Cable schedules & containment
  • Sightline & acoustic modelling
  • Power, heat load & ventilation
  • Equipment specification

The detailed work that turns a design into a system: control system programming, DSP configuration and tuning, video processing layouts, and the user interface that determines whether anyone enjoys using the room. We write and version-control the code, and you own it.

  • Control system programming
  • DSP configuration & tuning
  • User interface design
  • AV-over-IP routing logic
  • UC platform integration
  • Source code handover

Procurement handled as a project function, not a transaction. We hold accounts across the major manufacturers, track lead times against your programme, and flag substitutions early rather than on delivery day. Equipment is received, inspected and staged before it reaches site.

  • Vendor-neutral procurement
  • Lead-time management
  • Goods-in inspection
  • Warranty registration
  • Asset register

Racks are built and tested in our workshop, so site time is short and predictable. On site we work to method statements and risk assessments, coordinate with the other trades, and keep the first-fix and second-fix sequence aligned with the fit-out programme.

  • Off-site rack build & staging
  • First-fix containment & cabling
  • Method statements & RAMS
  • Trade coordination
  • Labelling & cable testing

AV rarely lives alone. We integrate with the corporate network, the UC platform, room booking, identity and access management, lighting, shades and building management — to your IT standards, with the firewall and certificate requirements documented in advance.

  • Network & VLAN alignment
  • Teams / Zoom provisioning
  • Room booking & calendars
  • Lighting & shade control
  • BMS interfaces
  • Device hardening

The stage most often compressed, and the one we protect. Each system is tested against written acceptance criteria and the results are handed over with the documentation. If a measurement misses the target, it is corrected before sign-off rather than noted as an observation.

  • Written test & acceptance plan
  • Audio levels & intelligibility
  • Display calibration
  • Conferencing performance
  • As-built documentation
  • User & administrator training

Support agreements sized to the criticality of the space, from business-hours response to 24/7 cover for control rooms. Preventive maintenance visits, managed firmware, spares holding and remote monitoring keep small faults from becoming outages.

  • SLA-backed response
  • Preventive maintenance
  • Firmware governance
  • Spares & loan stock
  • Remote monitoring
  • Lifecycle & refresh planning

Delivery method

How a project runs with us.

A predictable sequence with defined outputs at every gate, so you always know what you have bought and what comes next.

Brief & feasibility

Stakeholder workshops, site survey and a costed outline. Output: agreed brief, room schedule and budget range.

Detailed design

Full drawing set, specification and coordination with the other disciplines. Output: design package issued for construction.

Procurement & staging

Orders placed against the programme, racks built and tested off site. Output: staged system and tracked delivery schedule.

Site installation

First fix, second fix and termination, coordinated with the fit-out. Output: installed system and cable test records.

Commissioning & handover

Testing against acceptance criteria, training and documentation. Output: signed-off system and as-built pack.

Operate & improve

Support agreement, monitoring and periodic reviews. Output: uptime reporting and a refresh roadmap.